University Scheduling
New Brunswick Scheduling
Space Management
Enhanced Classroom Support
|
 |
Recent News
October 6, 2009
Scott 123, Data Projector Down
Please be advised that the stage right (primary) projector is currently not working in Scott 123. The stage left projector is working and may be used by selecting the left projector on the touch screen main menu. There appears to be a problem with the electrical system. We are working on getting the problem repaired, and having both projectors back on line as soon as possible.
September 11, 2009
The Livingston Campus is experiencing a power outage today, Friday, September 11. The Enhanced Classroom Support office is open but unable to receive phone calls until power is restored. Power is expected to be restored sometime Friday evening.
If you need immediate classroom assistance, you can call 732-690-6647 during the power outage. Once electrical service is restored, calls should be directed to the regular ECS phone number, 732-445-3612.
September 08, 2009
Summer Classroom Upgrades
-
Busch
Hill 114 Lecture Hall
Engineering B120
These two lecture halls underwent recent renovations this summer. New seating and carpeting were installed in each lecture hall.
For photographs of the renovations, please search our classroom database.
SERC 111
A brand new podium containing upgraded audiovisual equipment has been installed, and the projection screen and sound system, has been renovated. For photos of the new equipment and renovations, please search our classroom database at http://classrooms.rutgers.edu
-
Livingston Campus
Tillett 116 Lecture Hall
The lecture hall underwent dramatic physical renovations. New lighting color schemes, paneling, carpeting and fixed seating have been installed. A brand new designed podium, audiovisual equipment system, data projector and sound system have also been added. RU Wireless Internet is now active in all Tillett classrooms.
For photos of the new equipment, please search our classroom database.
Lucy Stone Hall Auditorium
The lecture hall has undergone a major renovation this summer. A brand new podium containing new audiovisual equipment has been installed. New seating and carpeting have been added to the lecture hall.
For photos of the new equipment and renovations, please search our classroom database.
-
College Avenue
Voorhees 105 Lecture Hall
The lecture hall underwent dramatic physical renovations. The stage has been removed, and stepped seating, lighting, paint scheme, and carpeting have been installed. A brand new designed podium, audiovisual equipment system, data projector and sound system have also been added. The room is equipped with RU Wired and RU Wireless Internet.
For photographs of the renovations, please search our classroom database.
Campbell A4 & A5
Hardenbergh A7
All three classrooms have been upgraded and are now equipped with (2) data projectors. This new arrangement allows for improved projector viewing for students.
For assistance with any of these classrooms and lecture hall, please view the operating instructions posted on our website http://scheduling.rutgers.edu/. One may also contact our department at equipment@classrooms.rutgers.edu to schedule a brief orientation session.
|